Product Description
The paint is composed by chlorosulfonated polyethylene rubber, synthetic resin, pigment, filler, additive and rubber vulcanizing agent, etc. The paint has good weather aging resistance, perfect acid, alkaline, and salt resistance and is resistant to chemical atmosphere, water, oil, heat, and cold. The film has excellent physical and mechanical properties with good elasticity, wear resistance, cracking resistance, quick drying and can be under construction at low temperature.
Design Purpose
It is can be widely used as finish in the industrial buildings affected by corrosion of chemical atmosphere, cement walls, steel structures, chemical pipeline, storage tanks, pots and equipment; outer walls of the carbamide and ammonium nitrate prilling towers, floor and terrace of the warehouse of the workshop; the surfaces of the buildings, equipment and oil tanks in the petroleum, oil refining and chemical engineering system; oil transportation pipeline, oil tanker, etc.
Physical Parameters | Color: | White, yellow, blue (provide other colors according to needs) | |||||||||||||
| Luster | Semi-gloss | |||||||||||||
| Theoretical spreading rate | 175g/m2, 180 g/m2, 170 g/m2 (with the corresponding color) 6.70m2/L, 6.70m2/L, 6.60 m2/L (calculated by 35μm dry film, excluding loss) | |||||||||||||
| Specific gravity: | 1.17, 1.20, 1.18 (with the corresponding color) | |||||||||||||
| Drying time | 23±2℃:surface dry≤ 1h, hard dry≤ 24h | |||||||||||||
| Flash point | 26℃ | |||||||||||||
| Storage period | 12 months | |||||||||||||
Construction Instruction | Service life | Unlimit | |||||||||||||
Construction method | Manual brushing, roller spray. | ||||||||||||||
Diluent | Special diluent for X-17 chlorosulfonated polyethylene coating. | ||||||||||||||
The largest amount of dilution | <15% | ||||||||||||||
Tool washing | Special diluent for X-17 chlorosulfonated polyethylene coating. | ||||||||||||||
Film coating thickness | Wet film: 95μm, dry film: 35μm | ||||||||||||||
Coating interval |
| ||||||||||||||
Surface treatment | If the preceding paint has been contaminated, take proper measurements to remove grease, dust, and also diluent for the preceding paint can be used to scrub. | ||||||||||||||
Construction condition | The paint must be stirred evenly before construction. Substrate temperature shall be greater than dew point above 3℃. The construction temperature of common paint had better be in range of 0- 35℃. Pay attention to weather and temperature changes during construction; construction shall be forbidden under rain, frog and snow or when the relative humidity is greater than 85%. In hot summer, construction in direct sunshine shall be forbidden. | ||||||||||||||
| Prior primer | Chlorosulfonated polyethylene pale primer, chlorosulfonated polyethylene iron red antirust paint, chlorosulfonated polyethylene micaseous iron antirust paint, red lead epoxy antirust paint, chlorinated rubber aluminum powder mastic antirust paint, chlorinated rubber iron red antirust paint, etc. | |||||||||||||
| Suggested number of coating | 2-3 passes, dry film reaches 80-100μm.. | |||||||||||||
Packing Specification | Container of 20 litersper20kg. | ||||||||||||||
Considerations | *Before construction, the paint must be fully stirred well. *Construction methods can be brushing and roller coating. Crisscross sequence and a certain speed shall be kept during coating to form compact and uniform coating and reduce porosity. Number of coating passes shall not be too many during brushing, general for 3 passes. If coating the finish too many times, the coating on the base layer or middle layer is easy to become rough to make the finish discolor. *Special diluent shall be used for the paint if using diluents. *Maintenance of the coating: after coating, come into use after 7d curing at room temperature. | ||||||||||||||
Safety guide | Please pay attention to the security issues on the packaging. In addition, relevant national safety code or specified by the local government shall be followed. Avoid inhaling solvent vapors and spray mist for long term, skin and eye may not contact with the product. Forced ventilation shall be provided when applying the paint in confined spaces or stagnant air, although in good ventilation, protection tools shall be worn. | ||||||||||||||
Annotation | *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it; *If above data is changed, the data is based on the latest instruction, without prior notification. |