免费一级a毛片在线播放'视频正片,欧洲破处AV,妖精囯产A片,九九热视频这里只有精品,国产美女在线一区二区三区,国产18在线播放

Guangzhou Tabard Fire-Proof Materials Co. Ltd. / Guangzhou Tabard Special Coating Engineering Co. Ltd. 

Details

Home  > PRODUCTS  > Anti-corrosion coatings > Primer > Details
HF-3 Micaceous Iron Epoxy Intermediate Paint (Two Components)
  • HF-3 Micaceous Iron Epoxy Intermediate Paint (Two Components)
  • Specifications
    • Product Name:HF-3 Micaceous Iron Epoxy Intermediate Paint (Two Components)
    • Product Number:HF-3
    • 分享到:
  • Details
  • Product Description

    It is composed by epoxy resin, scaly micaceous iron oxide, antirust additive and curing agent, etc. Packaging is divided into Component A and Component B. The paint contains scaly pigment with higher pigment volume concentration, after formation of the film, the pigment can be arranged in parallel directional overlapping sequence and similar to structure of “fish scale”, therefore, the film has higher sealing property, good heat resistance and anticorrosive performance and wide compatibility.


    Design Purpose

    It can be used as anticorrosive paint, also as additional coating for zinc-rich primer to increase sealing and anticorrosive properties. It is applicable to ship, container, bridge, gas chamber, harbor machinery, various steel structures and cement, etc.


    Physical Parameters

    Color:

    Grey, maroon

     

    Luster

    Lusterless

     

    Theoretical spreading rate

    290g/m2, 5.00m2/L (calculated by 100μm dry film, excluding loss)

     

    Specific gravity:

    About 1.45

     

    Drying time

    23±2℃: surface dry : 2h, hard dry: 24h

     

    Entirely cured

    23±2℃: 7d.

     

    Flash point

    23℃

     

    Storage period

    12 months

    Construction Instruction

    Mixing ratio

    Component A (paint): Component B (curing agent)=24:4


    Maturing time

    23±2℃: 0.5~1h


    Service life

    23±2℃: 8h


    Construction method

    High pressure siphon spray, air spray, manual brushing, roller painting.


    Diluent

    Diluent for X-7 epoxy coating






    The largest amount of dilution

    High pressure siphon spray

    Air spray

    Manual brushing, roller painting



    5%

    10%

    3%


    Spray orifice

    0.4~0.5mm

    2.0~3.0mm

    _


    Spray pressure

    15~30Mpa

    0.3~0.5 Mpa

    _


    Tool washing

    Diluent for X-7 epoxy coating.


    Film coating thickness

    Wet film: 200μm, dry film:100μm


    Coating interval

    Grey

    Substrate temperature

    5℃

    20℃

    30℃

    Minimum

    24h

    16h

    8h

    Maximum

    3 months

    Maroon

    Substrate temperature

    5℃

    20℃

    30℃

    Minimum

    24h

    16h

    8h

    Maximum

    7d

     


    Surface treatment

    *Surface coated withworkshop primer need second rust removal to reach Class St3 of Swedish de-rusting standard;

    *White rust, grease and other dirt on the paintwork coated with zinc-rich primer, with prolonged air exposure, shall be removed, chalked paintwork shall be polished and the dust shall be cleared away.


    Construction condition

    Substrate temperature shall be more than dew point above 3℃, relative humidity shall be less than 85%;

    If the substrate temperature is lower than 5℃, epoxy and curing agent stop reaction, construction can’t be undertaken.


    Prior primer

    Zinc-rich epoxy primer, iron red epoxy Workshop primer, ethylene phosphating primer, inorganic zinc-rich primer, etc.

     

    Finishing paint

    Epoxy finish, chlorinated rubber finish, acrylic acid finish, polyurethane finish, acrylic polyurethane finish, epoxy bituminous mastic coating, etc.

    Packing Specification

    Container of 20 liters can load Component A of 24kg; container of 5 liters can load Component B of 4kg.

    Considerations

    If the maximum coating interval is exceeded, coating shall be conducted after the preceding paint surface is polished roughly to ensure the adhesion between layers.

    Safety guide

    Avoid inhaling solvent vapors and painting mist for long term, skin and eye may not contact with the product.

    Forced ventilation shall be provided when applying the paint in confined spaces or stagnant air, although in good ventilation, protection tools shall be worn.

    Annotation

    *Above-said thickness of dry film and wet film refers to the index while implementing the high-pressure siphon spray;

    *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it;

    *If above data is changed, the data is based on the latest instruction, without prior notification. 

Tags: