Product Description
The product is consisted of acrylic resin, lightfast paint, wear resisting paint, additive, solvent and etc. The products have the characteristics of quick drying of paint film , not easy to turn yellow, wearing resistance of paint film, and etc.
Design Purpose
The product is used for coating traffic signs of asphalt and concrete surface.
Physical Parameters | Color: | White Medium yellow | |||
| Luster | Semi-gloss | |||
| Theoretical spreading rate | 175-220g/m2, 5.70m2/L (calculated by 50μm dry, excluding loss)
| |||
| Specific gravity: | 1.00-1.25 | |||
| Drying time | 23±2℃:surface drying≤2h, actual drying≤8h | |||
| Flash point | 25℃ | |||
| Storage period | 12 months | |||
Construction Instruction | Mixing ratio | Single canned | |||
| Maturing time | Open and stir | |||
| Service life | Unlimit | |||
Construction method | High pressure siphon spray,air spray, manual spray, roller spray | ||||
Diluent | Road marking paint special diluent | ||||
Maximal dilution amount | High pressure siphon spray<5%; air spray<10%; manual spray, roller spray<3% | ||||
Spray orifice | High pressure siphon spray0.4~0.5mm; air spray2.0~2.5mm | ||||
Spray pressure | High pressure siphon spray12~15Mpa; air spray0.3~0.5Mpa | ||||
Tool washing | Road marking paint special diluent | ||||
Film coating thickness | Wet film175μm, dry film75μm | ||||
Coating interval | Substrate temperature | 0℃ | 20℃ | 30℃ | |
The shortest | 24h | 8h | 6h | ||
The longest | Unlimit | ||||
Surface treatment | In the execution of construction, the pavement shall keep dry and clean. | ||||
Construction condition | The substrate temperature must over 3℃ than usual,relative humidity must over 85%. | ||||
Packing Specification | 20 liters containers can load 20kg components | ||||
Safety guide | Avoiding inhalation of vapor or mist, skin and eyes shall not be contacted with this product. In the process of construction, the forced ventilation shall be provided especially in the placeundernarrow and stagnant air condition. The protective gear shall be provided in the execution of construction. | ||||
Annotation | *Above-said thickness of dry film and wet film refers to the index while implementing the high-pressure air-free spray; *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it; *If above data is changed, the data is based on the latest instruction, without prior notification. |