免费一级a毛片在线播放'视频正片,欧洲破处AV,妖精囯产A片,九九热视频这里只有精品,国产美女在线一区二区三区,国产18在线播放

Guangzhou Tabard Fire-Proof Materials Co. Ltd. / Guangzhou Tabard Special Coating Engineering Co. Ltd. 

Details

Home  > PRODUCTS  > Anti-corrosion coatings > Primer > Details
GJ-2 Highly Chlorined Polyethylene Anti-Rust Paint
  • GJ-2 Highly Chlorined Polyethylene Anti-Rust Paint
  • Specifications
    • Product Name:GJ-2 Highly Chlorined Polyethylene Anti-Rust Paint
    • Product Number:GJ-2
    • 分享到:
  • Details
  • Product Description

    It is composed by highly chlorined polyethylene modified by epoxy resin, plasticizer and anti-rust pigment, with good anti-rust property, salt fog resistance, dryness and wetness alternation property, firm and tenacious paint film, strong adhesion force; the construction may be conducted under low temperature.


    Design Purpose 

    It is applicable for the corrosion prevention of various steel structures or concrete surface for corrosion of chemical atmosphere, industrial atmosphere, acid, alkali and salt.



    Physical Parameters

    Color

    Rusty red

     

    Theoretical spreading rate

    162g/m2, 8m2/L (calculated in 40μm dry film, excluding the loss)

     

    Specific gravity:

    About 1.30

     

    Drying time

    23±2℃: surface dryness:2h, solid dryness : 24h

     

    Flash point

    26℃

     

    Storage period

    12 months

    Construction Instruction

    Mixing ratio

    Canned by single pot


    Maturing time

    Use immediately after opening


    Service life

    Unlimit


    Construction method

    Manual painting;  roller coating, high-pressure air-free spraying


    Diluent

    X-16 highly chlorined polyethylene coating diluent


    Maximal dilution amount

    <5%


    Spraying hole

    20P20


    Spraying pressure

    195kg/cm2 (the spraying data is only used for reference; the adjustment may be conducted while using).


    Tool washing

    X-16 highly chlorined polyethylene coating diluent


    Film coating thickness

    Wet film: 125μm                     Dry film: 40μm


    Coating interval

    Temperature of substrate

    0℃

    20℃

    30℃

    Shortest

    24h

    8h

    6h

    Longest

    7d

    7d

    7d

     


    Surface treatment

    *The steel surface reaches Grade Sa2.5 of Sweden Derusting Standard subject to shotblasting, or reaches Grade St3 subject to manual or power tool, the surface after derusting should be coated with highly chlorined polyethylene rusty red primer within 24 hours so as to avoid producing the secondary rusting.

    *After the concrete cement mortar surface is placed and cured for a period of time so that the moisture evaporates sufficiently and the alkali salinity separates out and is eliminated thoroughly, the construction can be conducted, if there are crack, pockmark, air pore, unshelling or unevenness place, the putty may be employed for repairing evenly.


    Construction condition

    Prior to construction, the coating must be stirred sufficiently and uniformly.

    The temperature of substrate must be 3℃ higher than dewing point.

    The construction temperature of ordinary highly chlorined polyethylene anti-corrosive coating is between 0-35℃ preferentially. During construction, take notice the weather and temperature change; during rainy, foggy and snowy day, or the relative humidity is greater than 85% or the weather is scorching under direct irradiation by strong sunshine in summer, the construction can’t be conducted uniformly.

     

    Former primer

    Epoxy zinc rich workWorkshop primer, epoxy zinc powder workWorkshop primer, epoxy rusty red workWorkshop primer, inorganic zinc silicate workWorkshop primer, inorganic zinc silicate workWorkshop primer.


    Finishing paint

    Highly chlorined polyethylene mica iron anti-rust paint, highly chlorined polyethylene enamel paint (outdoor type), highly chlorined polyethylene enamel paint (indoor type).

    Packing Specification

    25Kg/20L per barrel

    Remarks

    The thickness of paint film may be modified according to use purpose or use area, however, the spreading rate, drying time and recoating interval may be changed correspondingly.

    Considerations

    *Prior to construction, the highly chlorined polyethylene anti-corrosive coating must be stirred sufficiently and uniformly, after that, the construction can be performed.

    *The highly chlorined polyethylene heavy anti-corrosive coating may be adopted with brushing painting and roller painting construction method( spray painting may be adopted for primer), the coating shall be conducted according to crisscross sequence and remains certain speed so as to form compact and uniform coating in thickness and reduce the generation of air pore. When the brush painting is adopted, the coating frequency is inadvisable to be too much, being of three times generally. If the repeating frequency for finish paint coating is too much, the coating at the bottom or in the middle layer is easily roughed so that the coating discolors.

    *For dilution of highly chlorined polyethylene heavy anti-corrosive coating, the special-purpose diluent for highly chlorined polyethylene heavy anti-corrosive coating should be employed. While coating during construction under low temperature and after sandblasting treatment, the coating isn’t required to be diluted. When the steel surface is constructed under higher temperature condition in summer, the primer must be coated after being diluted, however, the dilution dosage must be controlled between 5%~10% of coating volume.

    *Interval time of coating for highly chlorined polyethylene heavy anti-corrosive coating; after the steel surface is subjected to first pass of primer on the anti-rusting paint, the later pass of primer, medium paint and finish paint should be coated with the specified coating interval time.

    Safety guide  

    The Safety guide items on the packaging label should be noticed. In addition, thesafety laws and regulations specified by relevant state or local government should also be observed. Avoid breathing solvent steam or paint fog for a long term; the skin and eye can’t contact this product; while constructing in the narrow place or poorly ventilated place, the forced ventilation must be provided; while constructing, the protective articles should be worn.

    Annotation

    *Above-said thickness of dry film and wet film refers to the index while implementing the high-pressure siphon spray;

    *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it;

    *If above data is changed, the data is based on the latest instruction, without prior notification.


Tags: